Project
36 No triple height, 60 pallet banana ripening rooms with associated packing and loading areas.
Site
Coventry
Panel Type
Kingspan PIR, 15,000 m2
Construction Period
36 weeks with phased handover within an operational facility
(C) 2006 IC Insulated Construction Ltd